Academic publishing in Europe and N. America

Archive Publication ethics Submission Payment Contacts

FOREIGN EXPERIENCE OF REDUCING CONSTRUCTION TIME

Authors

Atrushba Raul

Rubric:Management
633
1
Download articleQuote
633
1

Annotation

The subject of this research is administrative relations that arise in the process of reducing the construction time as a branch of material production that is carrying out erection of buildings and reconstruction of structures of various designation. The object of this research is the construction complex as a whole; companies of various corporate structure functioning on the investment-construction sector; organizational legal forms of interaction between the parties to the investment-construction process; state regulation in the sphere of major construction.

Keywords

state regulation
investment and construction sector
the allocation of resources.
technological processes

References:

  1. Pearlson K. E. and Saunders C. S. Managing & Using Information Systems — A Strategic Approach. John Wiley & Sons. 2016. pp. 21–23.  
  2. Teh D. FAST TRACK Concept Application: Problem Identification, Problem Analysis, and Problem Solving Techniques. А paper presented at the 19th IPMA World Congress on Project Management. New Delhi, India. November, 2015.
  3. Meyer C. Fast Cycle Time — How to Align Purpose, Strategy and Structure for Speed. The Free Press, 2013. pp. 7–15.
  4. Lock D. (Ed.). Gower Handbook of Project Management. 2nd ed. Gower Technical Press Limited. 2014. pp. 311–326
  5. Jiang, S.L., Liu, M., Lin, J.H., and Zhong, H.X. A prediction-based online soft scheduling algorithm for the real-world steelmaking-continuous casting production", Knowledge-Based Systems, 111, 2016. pp. 159-172.
  6. Pearlson K. E. and Saunders C. S. Managing & Using Information Systems — A Strategic Approach. John Wiley & Sons. 2016. pp. 21–23.
  7. Al-Dhaheri, N., Jebali, A., and Diabat, A. A simulation-based genetic algorithm approach for the quay crane scheduling under uncertainty", Simulation Modeling Practice and Theory, 66, pp. 122-138 (2016).
  8. Slack N., Chambers S. and Johnston R. (2004). Operations Management. Prentice Hall. 2014. pp. 29-32.
  9. Tran, D. and Molenaar, K. Critical risk factors in project delivery method selection for highway projects", In Construction Research Congress 2012: Construction Challenges in a Flat World. 2012. pp. 331-340.
  10. Taghaddos, H., Hermann, U., AbouRizk, S., and Mohamed, Y. Simulation-based multiage approach for scheduling modular construction", Journal of Computing in Civil Engineering, 28(2), 2012. pp. 263-274  

Other articles of the issue

Abdukhalilova Laylo THE NEED TO IMPROVE MARKETING RESEARCH IN COMMERCIAL BANKS OF UZBEKISTAN
Download article in PDF3-7 pages670 views
cc-license
About us Journals Books
Publication ethics Terms of use of services Privacy policy
Copyright 2013-2024 Premier Publishing s.r.o.
Praha 8 - Karlín, Lyčkovo nám. 508/7, PSČ 18600, Czech Republic pub@ppublishing.org