FOREIGN EXPERIENCE OF REDUCING CONSTRUCTION TIME
Authors
Atrushba Raul
Rubric:Management
1130
2

Share
1130
2
Annotation
The subject of this research is administrative relations that arise in the process of reducing the construction time as a branch of material production that is carrying out erection of buildings and reconstruction of structures of various designation. The object of this research is the construction complex as a whole; companies of various corporate structure functioning on the investment-construction sector; organizational legal forms of interaction between the parties to the investment-construction process; state regulation in the sphere of major construction.
Keywords
state regulation
investment and construction sector
the allocation of resources.
technological processes
Authors
Atrushba Raul
Rubric:Management
1130
2

Share
1130
2
References:
- Pearlson K. E. and Saunders C. S. Managing & Using Information Systems — A Strategic Approach. John Wiley & Sons. 2016. pp. 21–23.
- Teh D. FAST TRACK Concept Application: Problem Identification, Problem Analysis, and Problem Solving Techniques. А paper presented at the 19th IPMA World Congress on Project Management. New Delhi, India. November, 2015.
- Meyer C. Fast Cycle Time — How to Align Purpose, Strategy and Structure for Speed. The Free Press, 2013. pp. 7–15.
- Lock D. (Ed.). Gower Handbook of Project Management. 2nd ed. Gower Technical Press Limited. 2014. pp. 311–326
- Jiang, S.L., Liu, M., Lin, J.H., and Zhong, H.X. A prediction-based online soft scheduling algorithm for the real-world steelmaking-continuous casting production", Knowledge-Based Systems, 111, 2016. pp. 159-172.
- Pearlson K. E. and Saunders C. S. Managing & Using Information Systems — A Strategic Approach. John Wiley & Sons. 2016. pp. 21–23.
- Al-Dhaheri, N., Jebali, A., and Diabat, A. A simulation-based genetic algorithm approach for the quay crane scheduling under uncertainty", Simulation Modeling Practice and Theory, 66, pp. 122-138 (2016).
- Slack N., Chambers S. and Johnston R. (2004). Operations Management. Prentice Hall. 2014. pp. 29-32.
- Tran, D. and Molenaar, K. Critical risk factors in project delivery method selection for highway projects", In Construction Research Congress 2012: Construction Challenges in a Flat World. 2012. pp. 331-340.
- Taghaddos, H., Hermann, U., AbouRizk, S., and Mohamed, Y. Simulation-based multiage approach for scheduling modular construction", Journal of Computing in Civil Engineering, 28(2), 2012. pp. 263-274